The day you get the keys to a new flat is exciting, and it is also the best time to get defects fixed. Once you move in and start interiors, the builder will find it easy to blame you for cracks, leaks or damage. A careful snagging visit before you sign the possession letter protects your money.
Before the visit
Ask the builder for a date when water and power are both on, carry the approved floor plan and the agreement, and take a measuring tape, a torch, a spirit level app, a phone charger to test sockets and a bucket of water. Go in daylight, and take someone with you to note points while you inspect.
Room-by-room checks
- Walls and ceilings: cracks, uneven plaster, damp patches and paint finish. Damp spots near bathrooms or the external wall often point to a leak.
- Floors and tiles: tap tiles to find hollow ones, check joints, level and chipped edges.
- Doors and windows: smooth opening, locks, hinges, gaps and glass. Pour water on window sills to check that it drains outside.
- Plumbing: run every tap and shower, check the pressure, look under sinks for leaks, flush every toilet and check that floor drains take water quickly.
- Electrical: test every socket and switch, check the distribution board labels, the earth connection and that the ELCB or RCCB trips when tested.
- Kitchen and balcony: slope towards the drain, the platform finish and the exhaust provision.
- Measurements: compare room sizes and the carpet area with the agreement. Under RERA, the price is based on carpet area.
Common areas
Look at the lift, staircases, fire fighting system, parking allotment, water tanks, power backup and the club or open areas promised in the brochure. Note anything that is not complete.
Tip:Write every defect in a dated list, attach photos and get it acknowledged by the builder. Give a reasonable time to fix it and check again before you sign.
Papers to collect at handover
- Possession letter, with the date.
- Occupancy or completion certificate, or proof that it has been applied for.
- Receipts for all payments, and the final statement of account.
- Allotted parking letter, and copies of warranties for fittings and appliances.
- Society or maintenance agreement and the maintenance deposit receipt.
Defects after you move in
Under the RERA Act, the builder is responsible for structural defects and poor workmanship reported within five years of possession, and must fix them within the time set by the law. Keep your snagging list and photos; they are your proof. For general information only, see our disclaimer. Still choosing between options? Read ready-to-move vs under-construction and the property documents checklist.
Frequently asked questions
Should I sign the possession letter if there are defects?
Ideally, list the defects in writing first and get them acknowledged and fixed. If you must sign, attach the defect list and keep the builder's acknowledgement.
How long is the builder responsible for defects?
Under the RERA Act, the builder must fix structural defects and workmanship problems reported within five years from the date of possession.
Can I hire a professional for snagging?
Yes. Many cities have home inspection services that use moisture meters and other tools. It is worth it for a large or costly flat.
This article is general information, written in November 2026, and is not legal, tax or financial advice. Rules, rates and limits change; please confirm the current position with the authority concerned or a qualified professional before you act.